Blog

Blog/Process

Custom Lead Time & Shipping | Vilatis

·
Process

What this covers

Lead time is calendar time from production lock to handoff to the carrier—not from first chat. Apparel sewing, SLA resin curing, and hand finishing each need real hours that cannot be skipped safely.

How we make it

A typical estimate has three buckets:

  • Queue. Waiting for a free production slot after lock.
  • Make. Pattern/cut/sew or SLA print + cure + hand finishing (+ optional glow detail).
  • Inspect and pack. Checklist pass, then protective packaging.

We publish or quote a window (for example 2–4 weeks) only after the brief is clear. If your event date is fixed, say so in the brief before lock so we can accept, re-quote, or decline.

What you provide

  • Hard deadline (if any) and timezone.
  • Shipping country and any address that may change.
  • Fast replies during revision rounds—waiting on you pauses the clock.

Limits and common mistakes

  • Carrier transit is separate from production lead time.
  • Peak seasons and re-prints after a failed inspection extend the window.
  • Changing size, mesh, or finish after lock adds make time; it is not “the same order running late”.
  • Modupyra series pieces follow series release schedules; do not assume apparel turnaround applies to modular tiles.

Next step

For what we check before a parcel leaves, read What we check before shipping.

Related Articles

Vilatis

En idé bliver til et produkt, du kan holde i hånden. AI åbner designet, en designer lukker det sammen med dig, og så laver vi det.

LumooaOrbiviModupyraMVVIS

Start med en idé, eller se det, der allerede er lavet.

Start AI-tilpasning
Om os
Om VilatisVirksomhed
Inspiration
Tillid og sikkerhed
Kontakt
Kontakt os
YouTubeX (Twitter)

SUUZH Network Technology Co., Ltd.
© 2026 Vilatis. Alle rettigheder forbeholdes.
Hvor idéer bliver til produkter.