Blog

Blog/Process

Custom Lead Time & Shipping | Vilatis

·
Process

What this covers

Lead time is calendar time from production lock to handoff to the carrier—not from first chat. Apparel sewing, SLA resin curing, and hand finishing each need real hours that cannot be skipped safely.

How we make it

A typical estimate has three buckets:

  • Queue. Waiting for a free production slot after lock.
  • Make. Pattern/cut/sew or SLA print + cure + hand finishing (+ optional glow detail).
  • Inspect and pack. Checklist pass, then protective packaging.

We publish or quote a window (for example 2–4 weeks) only after the brief is clear. If your event date is fixed, say so in the brief before lock so we can accept, re-quote, or decline.

What you provide

  • Hard deadline (if any) and timezone.
  • Shipping country and any address that may change.
  • Fast replies during revision rounds—waiting on you pauses the clock.

Limits and common mistakes

  • Carrier transit is separate from production lead time.
  • Peak seasons and re-prints after a failed inspection extend the window.
  • Changing size, mesh, or finish after lock adds make time; it is not “the same order running late”.
  • Modupyra series pieces follow series release schedules; do not assume apparel turnaround applies to modular tiles.

Next step

For what we check before a parcel leaves, read What we check before shipping.

Related Articles

Vilatis

En idé blir en produkt du kan hålla i. AI öppnar formgivningen, en designer stänger den tillsammans med dig, sedan tillverkar vi den.

LumooaOrbiviModupyraMVVIS

Börja med en idé, eller titta på det som redan är gjort.

Starta AI-anpassning
Om oss
Om VilatisFöretag
Förtroende och säkerhet
Kontakt
Kontakta oss
YouTubeX (Twitter)

SUUZH Network Technology Co., Ltd.
© 2026 Vilatis. Alla rättigheter förbehållna.
Där idéer blir produkter.