What this covers
Lead time is calendar time from production lock to handoff to the carrier—not from first chat. Apparel sewing, SLA resin curing, and hand finishing each need real hours that cannot be skipped safely.
How we make it
A typical estimate has three buckets:
- Queue. Waiting for a free production slot after lock.
- Make. Pattern/cut/sew or SLA print + cure + hand finishing (+ optional glow detail).
- Inspect and pack. Checklist pass, then protective packaging.
We publish or quote a window (for example 2–4 weeks) only after the brief is clear. If your event date is fixed, say so in the brief before lock so we can accept, re-quote, or decline.
What you provide
- Hard deadline (if any) and timezone.
- Shipping country and any address that may change.
- Fast replies during revision rounds—waiting on you pauses the clock.
Limits and common mistakes
- Carrier transit is separate from production lead time.
- Peak seasons and re-prints after a failed inspection extend the window.
- Changing size, mesh, or finish after lock adds make time; it is not “the same order running late”.
- Modupyra series pieces follow series release schedules; do not assume apparel turnaround applies to modular tiles.
Next step
For what we check before a parcel leaves, read What we check before shipping.